Lower-level bedroom ceiling scraped before sound insulation goes in
Example project
- Home
- 1970s split-entry in Mounds View; the lower-level bedroom sits under the kitchen
- Original request
- Pull the bedroom ceiling, pack the joists with sound insulation, hang new drywall
- Testing
- An MDH-certified inspector sampled the ceiling texture and, separately, the drywall and tape behind it
- Found
- Positive: the sprayed texture
- Clear
- Drywall and tape: no asbestos found
- Area
- One bedroom ceiling, roughly 220 sq ft
- Timeline
- Notice five days ahead; two days of removal and clearance
- Cost
- $2,500
In this example, a teenager sleeps in the lower-level bedroom of a 1970s split-entry in Mounds View, straight below the kitchen. Footsteps and the dishwasher carry right through, so the remodeler plans to open the ceiling, stuff the joist bays with sound insulation and put up new board.